Calculating the Step One Base Figure requires us to identify all ready willing and able DBE firms and all firms ready willing and able to do business with NJDOT.
49 CFR 26.45 requires us to begin the goal setting process by determining a base figure for the relative availability of DBEs. In order to accomplish this we identified: 1) ready, willing, and able DBEs; and 2) all firms ready willing and able to do business with NJDOT.
Step One Base Figure = Ready willing and able DBEs ÷ All firms ready willing and able
Ready willing and able DBEs
“Ready willing and able DBEs” are DBEs in the NJ Unified Certification Program (NJUCP) database with North American Industry Classification System (NAICS) codes in work categories where NJDOT would normally contract. These are firms that have voluntarily submitted to the NJUCP DBE certification process, thereby demonstrating a readiness, willingness, and the ability to participate as DBEs on NJDOT contracts.
We organized the NJUCP DBEs into construction firms, and consulting firms. There are 304 DBE construction firms and 277 DBE consulting firms (excluding duplicates).
All firms ready willing and able
“All firms ready willing and able” includes all NJDOT pre-qualified and cost-basis approved firms; ready willing and able DBEs as defined above; Emerging Small Business Enterprises in work categories where NJDOT would normally contract; sub-consultants and sub-contractors that have done business with NJDOT within the past three years; and haulers and suppliers that have been certified as Small Business Enterprises.
These firms, like the DBEs, were divided into construction firms, and consulting firms. There are 2139 construction firms and 505 consulting firms (excluding duplicates).
DBE construction firms= 304
DBE consulting firms= 277
All construction firms= 2139
All consulting firms= 505
Weighting
In order to ensure that our base figure was as accurate as possible, we weighted the base figure according to the projected capital program expenditures for federally funded construction services and professional services for FFY 09 projects. The total projected capital expenditures for FFY 09 are $410,601,490. The projected capital expenditures for construction services for FFY 09 are $363,846,490. The projected capital expenditures for professional services for FFY 09 are $46,755,000. Therefore, 89% of NJDOT contract dollars will be spent on construction projects and 11% on consulting.
Step One Base Figure = [% of construction projects for FFY 09 (DBE construction firms ÷All construction firms) + % of consulting projects for FFY 09 (DBE consulting firms ÷All consulting firms)] × 100
Step One Base Figure = [.89 (304 ÷2139) + .11 (277 ÷505)] × 100
Step One Base Figure = [.89 (.1421) + .11 (.5485)] × 100
Step One Base Figure = [.1265 + .0603] × 100
Step One Base Figure = 18.68